Smart meter safety risk – Letter to BC Minister of Energy and Mines Bennett

June 26. 2015 – For Immediate Release

 A COURT TOLD ITRON SMART METERS ARE A FIRE HAZARD.

 What did ITRON know and when did they know it? They knew these smart meters were dangerous and they knew from the very beginning.

 We, the taxpayers who fund BC Hydro, demand a refund from ITRON for selling a defective, dangerous device.

 ITRON’s smart meters have design flaws that make them fire hazards. These were sold to many places before they were sold to BC Hydro, so ITRON had to have been aware of problems long before the contract was signed.

Failures and fires have occurred in BC.   How many no one knows because no one is tracking.

BCUC was told through the Clean Energy Act and Direction 4 it had no authority to interfere in the smart meter program in any way.   BC Safety Authority has been told to butt out of the smart meter program. And the Provincial Fire Commissioner doesn’t track specific causes of fires. So no one knows, except, perhaps BC Hydro and they’re not talking.

But now, through sworn testimony in a legal action in Texas obtained by Sharon Noble, Director of the Coalition to Stop Smart Meters, we learn that there have been many incidents of ITRON Openway smart meters — the same model used by BC Hydro and Fortis BC — failing and burning, palettes of them, according to one testimonial.

Now is the time, before more homes are damaged, and more lives put at risk, to say this program is a fiasco. WE WANT THIS PROGRAM ENDED, AND WE WANT OUR MONEY BACK.

Noble says, “Whenever we purchase something that doesn’t work the way it is supposed to, we can return it and expect our money back. These smart meters were purported to be safe, just as safe as the old analogs. But they aren’t and now we have proof from a completely independent source – a Texas court.   Bill Bennett needs to stop this program, recall the smart meters, demand that analogs be put back in place, and send ITRON the bill.”’

Certainly ITRON knew long ago that these meters were cheaply made with flaws that could cause the meters to fail catastrophically. They should have warned us – it should not be up to us to have to fight to protect our homes. WE WANT OUR MONEY BACK.

———————————————–

Letter to BC Minister of Energy and Mines Bennett

 

From: Dennis and Sharon Noble [mailto:dsnoble@shaw.ca]
Sent: June 25, 2015 2:25 PM
To: Bill Bennett (mem.minister@gov.bc.ca); ‘bill.bennett.mla@leg.bc.ca
Cc: John Horgan. Leader NDP;
adrian.dix.mla@leg.bc.ca;
Christy Clark (premier@gov.bc.ca);
elizabeth.may@parl.gc.ca‘;
Atamanenko, Alex – Riding 1A; Atamanenko.A@parl.gc.ca; ‘andrew.weaver.mla@leg.bc.ca‘;
info@greenparty.bc.ca

Subject: Smart meter safety risk

VIA REGISTERED MAIL
June 25, 2015
Hon. Bill Bennett
Minister of Energy and Mines
Room 301
Parliament Buildings
Victoria, BC V8V 1X4

Dear Mr. Bennett:

In 2012 Armen Kassabian, Ontario Fire Marshal, wrote a report that expressed serious concerns about the safety of smart meters, regardless of the brand.  They fail.  They melt.  They burn.

http://www.stopsmartmeters.org/wp-content/uploads/2012/10/FireMarshallReportSmartMeterFires-Canada.pdf

Mr. Bennett, for the last 2 years I have been tracking smart meter failures in British Columbia, and have provided you with evidence showing that there is justification for major concern. Just like the Sensus smart meters in Saskatchewan, the Itron meters in BC have overheated, melted and burned. More failures have occurred in BC than in Saskatchewan, yet you and BC Hydro have taken no steps to ensure the public’s safety. In fact, you and BC Hydro have denied that these meters have failed or put lives at risk.

There is now evidence that you cannot – must not – ignore.

With this letter I have provided a printed copy of a recent lawsuit in Texas that contains testimony given under oath by journeyman linesmen who have worked for utilities for many years. They state that ITRON Openway meters used by Centerpoint Energy in Houston, the very same model being used by BC Hydro and Fortis BC, have failed in large numbers. This document also is available at

https://stopsmartmetersbc.com/wp-content/uploads/2015/05/Reed_Answering_Brief-1.pdf

Of particular note:

1)            Those testifying had confirmed fires and failures with other linesmen and trouble-shooters prior to making the statements. Pg. 25

2)            The linesmen reported that the utility had “two pallets of burned up (Itron) meters”.  Pg. 8

3)            The linesmen reported problems with “meters’ communication with the remote site control and many issues with meters melting and burning up.”  Pg. 8

4)            Linesmen determined that “part of the problem was a loose connection between the meter and the meter base because the smart meters had thinner “blades” than the previous analog meters” (emphasis added)     Pg. 8 This gap could cause arcing leading to fires.

5)            Concerns were raised about the ITRON smart meters “creating arc flashes, which could burn the customers’ wiring and create ‘hazardous conditions.’ …These hazardous conditions include potentially causing arc flashes, which could result in anything from minor to third degree burns to technicians who remove the meters.”  Pg. 8

6)            An experienced trouble-shooter for a utility reported that he had “responded to more fire calls once the smart meters were deployed and these often involved heating problems at the meter base.”  Pg. 13

7)            “ Reed’s testimony concerned products used by Respondent. Landis + Gyr is the manufacturer of the AMS meter used by Respondent and Itron is the manufacturer of the meters used by CenterPoint Energy in Houston.”  Pg. 25

The model used in Houston is the ITRON C2SOD, Openway Centron II the same model used by BC Hydro and Fortis BC.

http://investors.centerpointenergy.com/releasedetail.cfm?releaseid=553906

8)            At Oncor and Centerpoint there was a consistent corporate message that utility employees are to tell customers that any problem, whether it’s damaged appliances or a fire, was due to the meter base which is owned by the client, not the smart meter.  Pg. 10. This is the same message that, according to Hydro insiders, BC Hydro has given to its employees.

———-

Mr. Bennett, I could provide you with many statistics and data that I have gathered over the last 2 years that would help explain why the meters are a fire hazard, but I believe that is unnecessary. I have provided you with most of them already.   Instead, I will summarize what I have found in addition to the details provided above:

1)            Electronic digital and smart meters — which are combustible and vulnerable to heat — should have reliable means for immediately disconnecting them from the grid in the entirely foreseeable event of circuit failure (lithium-metal batteries, diodes, electrolytic capacitors, transistors, etc.). Such reliable means are apparently not provided. With an effectively unlimited current supply from the grid this lack of protection creates a significant fire risk when the meter is combustible as is the ITRON smart meter.

2)            I’ve been told by knowledgeable people that the remote disconnect switch apparently is unreliable and poorly designed, having been implicated in fires across North American. To function it relies on other components of the meter that, in all likelihood, would be compromised in the event of overheating or other failures. Arcing, arc flash, and heating from the disconnect switch are also serious hazards that derive from the unprotected grid connection.

3)            The meter installation process was questionable, given the lack of qualifications of the personnel recruited to carry out the installations. Use of inadequately qualified installation personnel significantly increases the risk of: (a) failure to observe existing meter base/wiring problems; and (b)  damaging the base during exchange; both of these can lead to “hot sockets” with the attendant risk of fire.

4)            The meter bases into which these meters are being placed were designed, tested, and CSA approved to hold an electro-mechanical analog meter which is not combustible. . Our multiple requests for proof of certification of the meter base in conjunction with a combustible electronic meter, either digital or smart meter, have been ignored. It is a highly questionable practice, probably illegal, to install electronic meters on a base designed and  CSA tested/approved only  for electro- mechanical analogue meters.

5)            In BC the BC Safety Standards Act exempts BC Hydro and Fortis BC from having their equipment certified by CSA and smart meters have been determined to be utility equipment.  The exemption is conditional under section 21-4 which states that utility equipment must be certified safe by a professional electrical engineer licensed in BC.  BC Hydro stated it does not have this certification.

6)            According to the Fire Commissioner’s Office, BC Hydro is allowed to remove and has removed smart meters from scenes of fires before the fire inspection has been completed “since it is their meter.” This runs counter to the BC Fire Safety Act.

7)            BC Hydro has reported that no smart meter has been inspected in its laboratory, Power Tech, after it has failed. Instead all failed meters are returned immediately to Itron for replacement. I have been told in response to a Freedom of Information request that BC Hydro is doing no investigation to determine the reason for the failure.

8)            There appears to be no agency that is tracking incidents involving smart meters.

The BC Utility Commission, according to the BC Utilities Commission Act, has responsibility to ensure BC Hydro’s products and practices will not endanger the public. With regard to the smart meter program, the BCUC informs me this responsibility has been overruled by the Clean Energy Act and Direction 4 because it has been told it cannot interfere in the smart meter program in any way, even with regard to public safety.

The BC Safety Authority, which normally ensures that electrical devices are safe and that any unsafe devices are reported, advised me that they have been told that they have no authority regarding the smart meter program.

9)            Fire reports have indicated the cause of some fires to be due to failed electrical distribution equipment. Len Garis, in the report commissioned by BC Hydro, stated that reference to electrical distribution equipment usually refers to meters.

10)          Budgets to fire departments have been reduced to the point where departments do not have the resources to determine causes of all fires. Many fires are not reported even after 2 years. In addition, one fire chief told me that they were told to rule out arson, and not bother going further. As a result in many cases, the fire’s cause is given as “undetermined.”  Of the fires for which I’ve requested reports from the Fire Commissioner, 50% have no determined cause!

11)          Because of the lack of resources, investigations are carried out by people with limited electrical fire forensics ability, and, therefore, it is possible that many fires that might be associated with smart meters are going undetected. As a result, it is possible that many problems are going undetected and unremedied, jeopardizing the property and lives of British Columbians.

12)          Regulations in Quebec require that Hydro-Quebec ensures that smart meters are not within 3 meters of a propane tank. If the tank or meter cannot be removed, then the remote disconnect switch, which has been found to have been involved in fires in Saskatchewan, must be disabled. It seems prudent that similar precautionary measures should be taken regarding proximity of smart meters to any flammable materials. I wrote to you, Mr. Bennett, and BC Hydro authorities on June 4 asking what precautionary steps BC Hydro would be taking, and to date I received no response.

Our Charter of Rights and Freedoms, Section 7, grants Canadian citizens the right to refuse actions by the government that the citizens believe to be harmful.

Further, “the Federal Court of Appeal has opened the door to lawsuits against government regulators for negligent administration of their regulatory schemes and created the possibility of suing a regulator for damages under public law if the regulator violates a clear duty to act or exercises its public power in an “irrational” or “clearly wrong” manner.”

http://www.jdsupra.com/legalnews/beekeepers-abuzz-after-court-allows-clas-01297 /

Based upon the information I’ve provided to you, I believe it is safe to say that this smart meter program has major problems that cannot be ignored any longer. You, Mr. Bennett, as Minister of Energy, are responsible for allowing this program to continue.  With receipt of this package of material, which I am sending via registered mail, you cannot say you didn’t know that these smart meters are fire hazards.

I am sure that your concern for the safety and welfare of your constituents is paramount. Based upon the information I’ve presented, this concern is best addressed by halting the program and removing the smart meters, pending an investigation.

Should you wish further information about anything that I’ve said, please ask.

 

Sincerely,
Sharon Noble

 

This will be sent to  All MLAs

Health Canada, our Provincial Government and Dr. Perry Kendall, our PHO, are NOT protecting us from today’s microwave radiation!

A letter from Jerry Flynn to BC Municipal and Regional Governments

 

June 17, 2015

Dear Municipal/Regional District Governments and UBCM,

Contrary to what Health Canada, the BC Government and BC’s Provincial Health Officer (PHO) , Dr. Perry Kendall tell us all, the unvarnished truth about  today’s wireless radio products e.g., baby monitors, Smart Meters, Wi-Fi routers, cell phones, cell towers, cordless phones, tablet and laptop computers, GPS, AM and FM transmitting towers etc. can be seen below. The attachment is self-explanatory:

  • On May 11, 2015, the International EMF Scientists Appeal, signed by more than 200 world-class scientists from 39 countries and sent to the Secretary General of the United Nations, to all UN member countries, and to the WHO appealed to all of them to protect humans and wild life from the dangers of EMF and wireless technology! http://www.reuters.com/article/2015/05/11/ny-emfscientistorg-idUSnBw115200a+100+BSW20150511
  • Insurance companies WILL NOT INSURE against any health-related claim attributed to the radio / microwave frequency radiation emitted by today’s wireless radio devices!
  • No President and Chief Executive Officer of any wireless or telecom company or any electric utility – anywhere – will state unequivocally that their wireless products are SAFE, i.e., they can be safely used by, on or around people of all ages and sizes, regardless of any illnesses and/or diseases they might already be suffering from, on a continuous basis all day, every day, in perpetuity — as Smart Meters, cell phone towers, Wi-Fi routers, AM and FM towers, cordless phones etc. do. These devices all  emit pulsed, NON-thermal radiation 24/7/365 in perpetuity, and only Wi-Fi routers are capable of being shut off.
  • But the above CEOs all do say that their products COMPLY with Health Canada’s Safety Code 6! It is critical that you fully understand the importance of this difference! Health Canada, the BC Government and BC’s PHO all allow the wireless and telecom industry and both electric utilities to sell and install their purportedly ‘safe’ wireless products simply because they COMPLY with Safety Code 6!
  • Today’s Safety Code 6 dates back to 1979 and, sadly, has changed very little since then (which was almost 10 years before cell phones appeared en masse in Canada, and today there are in excess of 7-Billion cell phones world-wife!). Safety Code 6 is and always has been the root cause of what non-industry scientists consider is a crime against humanity! Because of Safety Code 6, innocent, unsuspecting and utterly defenseless people (including government members themselves and their families) are being literally forced – by law – to endure what has become, over these past 25 or so years, a dense, ever-thickening, yet invisible cloud of electro-magnetic radiation (EMR), which the World Health Organization has coined: “Electro-Smog.” Non-industry scientists the world-over consider this EMR to be the biggest single threat to human health in our planet’s entire history! Originally, Safety Code 6 was established to provide up to six (6) minutes’ protection to federal workers weighing, on average, 200 pounds, who needed to maintain or service high voltage transmission lines, power sub-stations etc. Yet, somehow, over these past 35-or so years, Health Canada has managed things such that the general population are now told that Safety Code 6 protects them from ALL sources of radiation – simultaneously, regardless of how many microwave-emitting devices may impact on a person, a family or an entire community! This is not right! This is knowingly dishonest! This is criminal! Imagine for a moment a Motor Vehicle Highways Department that sets the highway speed limit at, say, 300 MPH, knowing full well that automobiles cannot go that fast! Consequently, no vehicle can ever exceed the ‘legal’ speed limit! The same applies to wireless radio devices: because Safety Code 6 radiation Exposure Limits are so egregiously high, Health Canada and Industry artfully tell us all that their products are in compliance, and therefore they must be safe! Now perhaps the reader can understand why Safety Code 6 is, and always has been, vilified around the world by non-industry scientists and informed people everywhere!
    http://www.magdahavas.com/pick-of-the-week-8-failed-attempt-to-reduce-safety-code-6-guidelines-in-1977/
  • None of today’s wireless products has had to undergo independent, pre-market Safety tests to ensure they are safe to be used by, on and around people on a continuous 24/7/365 day basis in perpetuity! Eminent non-industry scientists say that no level of radiation is safe for people! Examples include: Anthony Miller, Professor Emeritus of the Dalla Lana School of Public Health, University of Toronto, Dr. Neil Cherry of New Zealand (now deceased), two-time Nobel nominee Dr. Robert O. Becker (now deceased), Dr. Olle Johansson of the Karolinskaa Institute in Sweden. Others say: “If there is a SAFE level, we haven’t discovered it yet.”
  • Even the cell phone industry’s own studies, in both the U.S. and Germany, showed their products are harmful to people – – and might lead to cancer!
  • Most if not all major cell phone manufacturers have taken out global patents in which they themselves acknowledge their products are harmful and can cause or may lead to cancer!
  • Every cell phone manufacturer includes in their Owner’s Manual specific instructions not to hold the device within a specific distance from any part of the body – not just the head!
  • It is no accident that the so-called ‘safe radiation Exposure Limits reflected in Safety Code 6 are virtually identical to those of the USA. The specific group of scientists who determine the ‘Exposure Limits’ for the U.S. includes members of the U.S. Air Force, U.S. Army, Motorola, Nokia, Siemens, Alcatel-Lucent and Bell. All Canadians – governments and public alike – should note that the Co-Chairman of that very committee is Health Canada’s own Dr. Art Thansandote! A position he has held since at least 2008! Dr. James McNamee is also on it (and it was he who was the principle scientist responsible for the latest iteration of Safety Code 6-2015!) Other members include representatives from Health Canada, Industry Canada – – and Exponent Inc., the product-defense scientists who so effectively defended both BC Hydro and Fortis BC with respect to the ‘safety’ of their proposed   wireless Smart Meters!

Readers needing more evidence should note the Federal Government of Canada’s own recent Parliamentary Health Committee (HESA) report on Safety Code 6, in April 2015. (See below).

Parliamentary Health Committee (HESA) Investigation into Safety Code 6, 2015.

(for the full version go to http://www.c4st.org/HESA2015).   Highlights:

  • Health Canada admits studies show harm at levels below Safety Code 6;
  • Health Canada ignores the scientific research: its review is subject to bias and incorrect conclusions;
  • Health Canada and Industry Canada ignore recommendations from the 2010 Health Committee “offer to provide information, including awareness sessions on exposure to radiofrequency electromagnetic radiation.”
  • In its “fact sheet”, comparing Canada vs other countries, Health Canada omits countries representing 1.2 billion people with safety levels below Safety Code 6;
  • Health Canada’s statements to the committee conflict with statements made under oath in Quebec Superior Court on Feb. 13th, 2013 (Dr. James McNamee had admitted to the judge in 2013 that Safety Code 6 applied only to THERMAL radiation!).
  • Health Canada admits there are no studies regarding the cumulative effects of several devices from wireless radiation.
  • Health Canada ignores the 2010 Health Committee recommendation to “ensure that it has a process in place to receive and respond to reports of adverse reactions to electromagnetic radiation emitting devices.”
  • Health Canada resists the request to have a database that physicians may be asked to look at any kind of possible cause and effect on new cancers among people?
  • Scientific expert calls for a special category for pregnant women.
  • Health Canada advises that 36 of the 140 Studies submitted by C4ST WERE included in the 2015 Safety Code 6 – BUT WHERE?
Read HESA’s report concerning:
  • Evidence of links to brain cancer;
  • Evidence of links to breast cancers;
  • Evidence that children are more at risk;
  • Canadians feel deceived by product manufacturers and the government;
  • Evidence of damage to sperm;
  • Experts call for public education;
  • Evidence for recognition of, and treatment for, electro-hypersensitivity (EHS).

Readers should recall that in 2010, British Columbia’s Bill 17 (the “Clean Energy Act”) was passed by Gordon Campbell’s government, which mandated that Smart Meters be installed on all dwellings and occupied buildings in B.C. Tragically, the Government of BC permitted B.C. Hydro to utilize wireless radio Smart Meters, which emit pulsed, NON-thermal microwave frequency radiation (called electro-magnetic radiation or “EMR”). One year later, in 2011, the World Health Organization (WHO) classified EMR – ALL EMR – a Class 2B or “Possible” carcinogen. Any reasonable person would have expected, given the WHO’s re-classification of EMR to that of a  Possible Carcinogen, that BC’s Government would have repealed wireless radio Smart Meters and immediately ordered that wireless Smart Meters already installed be replaced with harmless, non-irradiating analogue meters. But that never happened! This is the government British Columbians have today. Consequently it falls to Municipal and Regional governments and to UBCM to wake up and stand up – – for every person, flora and fauna living in British Columbia! If you won’t protect us, who can?

Those requiring or wanting more information, please feel free to contact me.
Sincerely,
James G. (“Jerry) Flynn, Captain (retired)
5181 Gainsberg Road
Bowser, B.C., V0R 1G0
778-424-9609

 

Flynn letter to College of Physicians and Surgeons – Dr. Perry Kendall June 14, 2015

EM – Electromagnetic Age – Sleeping Giant – Dr. Paterson – VERSION 2

Dr Paterson has made several presentations in the Okanagan Valley of BC describing the Potential Health Effects of our modern Wireless Age with Smart Phones,  Wi-Fi devices and Smart Meters.

This is the new version  VER2.

See his slide presentation here.  The format is in PDF format and the file is rather large, about 60 MBytes so you have to down load the file and then open it with Adobe Reader.  Sorry, there is no audio with this version.  We are working on getting a YouTube version with Dr. Paterson narrating and giving more details.

Dr. Paterson’s presentation describes the major health impacts of RF Radiation and is a must view.  Please educate yourself to protect yourself and your family.

The presentation/lecture consists of 153 slides.  So grab a coffee, tea, or a cool beer and sit back and learn about RF Radiation and the impact it has on your health.

Dr. Paterson’s Professional History
https://stopsmartmetersbc.com/wp-content/uploads/2015/04/MCP_BioSketch_CSI-2.pdf

Dr. Paterson’s presentation/lecture.
https://stopsmartmetersbc.com/wp-content/uploads/2015/06/EM Age Sleeping Giant VER2.pdf